MET Tower Installed At Dairy Air Wind In Holland

By: 
Ed Barber
Staff Writer

A wind testing tower knowns as MET has been installed at Dairy Air Wind LLC in Holland Vermont. The tower is just shy of 200 feet tall. A hearing to discuss a proposal to install a 2.2 megawatt industrial wind turbine on site was postponed last week by the Public Service Board. A new hearing has yet to be scheduled. Read more in the Newport Daily Express.

Category: